reserves

January, 10, 2023

COEUR'S MINERAL RESERVES

Year-End 2025
Grade Contained
PROVEN RESERVES
  Tonnes Gold
(g/t)
Silver
(g/t)
Zinc
(%)
Lead
(%)
Copper
(%)
Gold
(oz)
Silver
(oz)
Zinc
(lbs)
Lead
(lbs)
Copper
(lbs)
New Afton - - - - - - - - - - - -
Rainy River 16,915,000 0.44 2.33 - - - 240,000 1,215,000 - - -
Las Chispas 982,000 4.18 442.58 - - - 132,000 13,973,000 - - -
Palmarejo 5,137,000 1.79 117.12 - - - 295,000 19,344,000 - - -
Rochester 402,556,000 0.009 12.81 - - - 1,162,000 165,799,000 - - -
Kensington 1,539,000 5.92 - - - - 293,000 - - - -
Wharf 20,334,000 0.73 - - - - 477,000 - - - -
Total 447,462,000 0.18 14.64       2,600,000 200,332,000 - - -
PROBABLE RESERVES
  Tonnes Gold
(g/t)
Silver
(g/t)
Zinc
(%)
Lead
(%)
Copper
(%)
Gold
(oz)
Silver
(oz)
Zinc
(lbs)
Lead
(lbs)
Copper
(lbs)
New Afton 36,174,000 - 0.67 1.80 - - 0.74% 778,000 2,092,000 - - 591,000,000
Rainy River 37,595,000 1.64 3.60 - - - 1,986,000 4,356,000 - - -
Las Chispas 2,238,000 2.28 198.64 - - - 164,000 14,292,794 - - -
Palmarejo 13,927,000 1.41 100.44 - - - 632,000 44,973,000 - - -
Rochester 45,101,000 0.12 11.04 - - - 171,000 16,014,000 - - -
Kensington 1,297,000 6.07 - - - - 253,315 - - - -
Wharf 34,727,000 0.69 - - - - 773,000 - - - -
Total 171,060,000 0.87 18.82       4,757,000 81,782,000 - - 591,000,000
PROVEN AND PROBABLE RESERVES
  Tonnes Gold
(g/t)
Silver
(g/t)
Zinc
(%)
Lead
(%)
Copper
(%)
Gold
(oz)
Silver
(oz)
Zinc
(lbs)
Lead
(lbs)
Copper
(lbs)
New Afton 36,174,000 - 0.67 1.80 - - 0.74% 778,000 2,092,000 - - 591,000,000
Rainy River 54,510,000 1.27 3.18 - - - 2,226,000 5,571,000 - - -
Las Chispas 3,221,000 2,87 272.95 - - - 297,000 28,266,000 - - -
Palmarejo 19,064,000 1.51 104.94 - - - 928,000 64,318,000 - - -
Rochester 447,656,000 0.09 12.63 - - - 1,332,000 181,814,000 - - -
Kensington 2,836,000 5.99 - - - - 546,000 - - - -
Wharf 55,061,000 0.71 - - - - 1,250,000 - - - -
Total 618,552,000 0.37 14.18       7,357,000 282,060,000 - - 591,000,000

Notes to above Mineral Reserves:

  1. Certain definitions: The term “reserve” means that part of a mineral deposit that can be economically and legally extracted or produced at the time of the reserve determination. The term “proven (measured) reserves” means reserves for which (a) quantity is computed from dimensions revealed in outcrops, trenches, workings or drill holes, grade and/or quality are computed from the results of detailed sampling; and (b) the sites for inspection, sampling and measurements are spaced so closely and the geologic character is sufficiently defined that size, shape, depth and mineral content of reserves are well established. The term “probable (indicated) reserves” means reserves for which quantity and grade and/or quality are computed from information similar to that used for proven (measured) reserves, but the sites for inspection, sampling and measurement are farther apart or are otherwise less adequately spaced. The degree of assurance, although lower than that for proven (measured) reserves, is high enough to assume continuity between points of observation. The term “cutoff grade” means the lowest grade of mineralized material considered economic to process. Cutoff grades vary between deposits depending upon prevailing economic conditions, mineability of the deposit, by-products, amenability of the mineralized material to silver or gold extraction and type of milling or leaching facilities available.
  2. The Mineral Reserve estimates are current as of December 31, 2025, are reported using the definitions in Item 1300 of Regulation S-K and were prepared by the Company’s technical staff. Mineral Reserve point of reference is delivered to the process facility.
  3. Assumed metal prices for 2025 Mineral Reserves were $26.00 per ounce of silver, $2,200 per ounce of gold, $4.40 per pound of copper, $1.15 per pound of zinc, $0.95 per pound of lead.
  4. Palmarejo Mineral Reserve estimates use the following key input parameters: assumption of conventional longhole underground mining; reported above a variable gold equivalent cut-off grade that ranges from 1.27–2.19 g/tonne AuEq and an incremental development cut-off grade 0.78 g/tonne AuEq; metallurgical recovery assumption of 95.4% for gold and 87.1% for silver; mining dilution assumes 0.4–1.0 meter of hanging/foot wall waste dilution; mining loss of 15% was applied; variable mining costs that range from US$32.29–$43.08/tonne, surface haulage costs of US$4.40/tonne, process costs of US$30.02/tonne, general and administrative costs of US$14.17/tonne, and surface/auxiliary support costs of US$3.52/tonne. Excludes the impact of the Franco-Nevada gold stream agreement at Palmarejo in calculation of Mineral Reserves. No assurances can be given that all mineral reserves will be mined, as mineralized material that may qualify as reserves under applicable standards by virtue of having positive economics may not generate attractive enough returns to be included in our mine plans, due to factors such as the impact of the gold stream at Palmarejo. As a result, we may elect not to mine portions of the mineralized material reported as reserves.
  5. Rochester Mineral Reserve estimates are tabulated within a confining pit design and use the following input parameters: Rochester oxide variable recovery Au = 71.2–85.9% and Ag = 59.4%; Rochester sulfide variable recovery Au = 15.2–77.7% and Ag = 0.0–59.4%; with a net smelter return (“NSR”) cut-off of $4.12/ton oxide and US$4.22/ton sulfide; Nevada Packard oxide recovery Au = 88.4% and Ag = 59.4%; with a net smelter return cut-off of $4.92/ton for oxide; Lincoln Hill oxide recovery Au = 61-63.9% and Ag = 18.5-39.5%; with a net smelter return cut-off of $5.02/ton for oxide where the NSR is calculated as net smelter return (NSR) = silver grade (oz/ton) * silver recovery (%) * (silver price ($/oz) - refining cost ($/oz)) + gold grade (oz/ton) * gold recovery (%) * (gold price ($/oz) - refining cost ($/oz)); variable pit slope angles that approximately average 48º over the life-of-mine.
  6. Kensington Mineral Reserve estimates use the following key input parameters: assumption of conventional underground mining; reported above a gold cut-off grade of 0.123 oz/ton Au and an incremental development cut-off grade of 0.04 oz/ton Au; metallurgical recovery assumption of 94.5%; gold payability of 97.5%; gold royalty of 1.5%; mining dilution of 15-20%; mining loss of 12% was applied; mining costs of US$127.32/ton mined; process costs of US$51.48/ton processed; general and administrative costs of US$49.74/ton processed; sustaining capital US$5.79/ton processed; and concentrate refining and shipping costs of US$104.73/oz sold.
  7. Wharf Mineral Reserve estimates use the following key input parameters: assumption of conventional open pit mining; reported above a NSR cut-off grade of $13.42/ton ; average metallurgical recovery assumption of 78.0%; royalty burden of US$112.00/oz Au; pit slope angles that vary from 34–50º; mining costs of US$2.71/ton mined, process costs of US$13.42/ton processed (includes general & administrative and sustaining capital costs).
  8. Las Chispas Mineral Reserve estimates uses the following key input parameters: assumption of conventional underground mining; reported above a silver equivalent (AgEq) cut-off grade of 140 g / tonne and an incremental development cut-off grade of 59 g/tonne AgEq; metallurgical recovery assumption of 97.5% for silver and 98.0% for gold; mining dilution assumes 5% for development, 1 meter to 1.25 meters of ELOS (0.25 m – 0.5 m of hanging wall and 0.5 m – 1.0 m of footwall dilution) depending on geotechnical conditions in each stoping location, 0.2 meter ELOS (0.1 m of hanging wall and 0.1 m of footwall dilution) for cut and fill, 0.25 m for each exposed backfill floor, and 0.5 m for each exposed backfill wall; mining loss of 2% for development and 5% for stoping was applied; variable production mining costs that range from US$65–US$154/tonne, development mining costs of US$39/tonne, process costs of US$42/tonne, site general and administrative costs of US$25/tonne, underground general and administrative costs of US$18/tonne, and sustaining capital costs of US$12/tonne.
  9. New Afton Mineral Reserve estimates uses the following key input parameters: New C-Zone block cave Mineral Reserves are reported at a cut-off NSR of US$24/tonne and East Extension Mineral Reserves are reported at a cut-off NSR of US$100/tonne, based on processing costs of US$9.00/tonne processed, G&A costs of US$3.50/tonne processed, block caving costs of US$11.50/tonne ore mined, and stoping costs of US$87.50/tonne ore mined. Metallurgical recoveries vary depending on ore type and grades.
  10. Rainy River Mineral Reserve estimates uses the following key input parameters: The estimate for the open pit mineral reserves uses the following key input parameters: conventional open pit mining; gold price of US$2,200/oz Au and silver price of US$26/oz Ag; gold selling cost of US$3.54/oz Au and silver selling cost of US$1/oz Ag; reported above a gold equivalent cut-off grade of 0.30 g/tonne AuEq; variable metallurgical recoveries; royalty burden of 1.4%; variable pit slope angles by litho-structural domain; overburden mining cost of US$3.18/tonne mined, base mining cost at 300 m bench of US$4.38/tonne mined and incremental mining cost of US$0.025/tonne mined per 10 m bench; processing cost of US$10.40/tonne processed, and general and administrative costs of US$4.49/tonne processed.
  11. Rounding of tonnes, grades, and ounces, as required by reporting guidelines, may result in apparent differences between tonnes, grades, and contained metal contents.