Coeur
 

Development

Palmarejo - Coeur's Newest World-Class Silver/Gold Growth Project

As one of the world’s highest quality silver-gold projects, Palmarejo positions Coeur as the leading primary silver producer in terms of annual silver production and resource base. The Palmarejo project is expected to begin production in early 2009 at an annualized rate of approximately 10.4 million ounces of silver and 115,000 ounces of gold per year with cash costs, net of gold bi-product, of an estimated ($0.41) per ounce of silver and an initial mine life of nine years. Exploration continues on the large land package, with current measured and indicated mineral resources of 88.7 million silver ounces and 1.0 million measured and indicated gold ounces, and an additional 61.4 million ounces of inferred silver mineral resources and 0.7 million inferred gold ounces.

The Palmarejo Project is located in the state of Chihuahua in northern Mexico and lies in Mexico's premier silver region, the gold-silver belt of the Sierra Madre Occidental. The Palmarejo tenement covers approximately 12,160 hectares and the current development project is located on one of 14 silver targets identified to date on the tenement.

Mineral Resources (as of 9/17/07)
Deposit Tonnes Grade Ounces
Gold g/t Silver g/t Gold Silver
Palmarejo1
Measured 5,100,000 2.22 197 367,000 32,520,000
Indicated 8,800,000 2.01 184 571,000 52,390,000
Inferred 4,500,000 1.39 153 203,000 22,290,000
Guadalupe2
Indicated 710,000 2,15 168 49,000 3,790,000
Inferred 8,000,000 1.34 136 345,000 35,120,000
La Patria3
Inferred 3,600,000 1.49 35 171,000 4,030,000

Note:
1 Source: Palmarejo Updated Resource Statement – September 2007 - A 0.8 g/t AuEq cutoff has been applied to Palmarejo - only those blocks with higher interpolated grade than these cut-offs have been included in the resource statement above.
2 Source: Palmarejo Updated Resource Statement – September 2007 – 0.8 g/t AuEq cut-off has been applied to Guadalupe to a depth of 150 meters below surface and a 2.5 g/t AuEq cut-off has been applied for mineral resources occurring deeper than 150 meters below surface - only those blocks with higher interpolated grade than these cut-offs have been included in the resource statement above.
3 Source: Palmarejo Updated Resource Statement – September 2007 – A 0.8 g/t AuEq cut-off has been applied to the La Patria resource estimate. Only those blocks with higher interpolated grade than this cut-off have been included in the resource statement above.

Click to Enlarge